Reworked and repaired the Mountain line
Click above for HOME
The twins working on the inner loop.  Dump the dirt, reballast and make sure the side to side shows "0" bubble.
This loco shed has had it's roof rebuilt for the second time. See how I did it below.  It really came off a lot better than I had hoped it would.
I anticipation of the upcoming Arizona Connection Run, I have been doing a lot of work.  The Mountain line which supports the "Poochkee Mine" had some major issues.  Reballasting, a dead LGB switch, out of control vegetation...yipes!  Everything is running smooth as silk now.  Mainline and Trolley Line also had maintenance of way being done on it as shown below...